Tateyama Kurobe weather: monthly temperatures and crowds
Day tour
(Summer/Fall only) Tateyama-Kurobe: Walking on the 'Roof of Japan'
fromUS$237.85
Klook, GetYourGuide and Viator may pay us a commission on this booking, at no extra cost to you. Affiliate disclosure
See dates on KlookPick your month
When to go on the Alpine Route
Go from late May to late June4 for the snow walls with fewer people, in summer for mild walking weather, and from mid-September to early November1 for autumn leaves.
Open 15 April to 30 November 20262
- Whole route running: May to October
- Part month or cut-back buses: April, November
- Winter shutdown: December to March
Best months for each goal
- Snow walls: the Yuki-no-Otani walk runs 15 April to 25 June, open 9:30–15:005, between walls up to 20 m6 high. See snow corridor dates and tips.
- Snow with smaller crowds: the official site suggests late May to late June4, when the weather is pleasant and the crowds thin.
- Ptarmigan: May to June7 is the raicho (ptarmigan) mating season.
- Mild hiking weather: July and August sit at about 10–20°C8, and Murodo-daira has a variety of hiking trails.
- Mikurigaike Pond: its viewing season is June to November4, and the walk to Mikurigaike Pond takes 15 minutes6 from Murodo Terminal.
- Kurobe Dam water discharge: it runs all day from 26 June to 15 October1.
- Autumn leaves: the colour starts high in mid-September9 and works its way down, because the elevation changes by 2,000 m1 across the route.
- Fresh snow and leaves together: the official site points to November10, when temperatures often drop below freezing8.
Busy weeks to avoid
The official crowd calendar expects these periods to be especially busy:
- From the full opening to Golden Week, 15 April to early May11
- The Obon holiday, mid-August11
- Holiday weekends in the leaf season, mid-September to mid-October11
On those days the crowds last from early morning into the afternoon. From late July to mid-October9, the first few departures of the day are especially crowded too.
Before you go, read Alpine Route ticket types explained. If you’d rather hand the timing to someone else, compare guided Alpine Route day tours, such as this summer and autumn walk on the roof of Japan.
Temperatures and crowds
What is the weather like at Murodo each month?
Murodo is cold for the season: it sits at 2,450 m12 and runs about 12–15°C9 cooler than the plains below.
Murodo at 2,450 m12
| Month | Murodo high / low | Crowds and timetable | What's on |
|---|---|---|---|
| April | 6°C / -3°C | Especially busy from opening on 15 April | Snow wall walk from 15 April, walls up to 20 m |
| May | 10°C / 3°C | Golden Week busy in early May; fewer crowds from late May | Snow walls; ptarmigan mating season |
| June | 14°C / 7°C | Fewer crowds to late June | Snow walls to 25 June; dam discharge from 26 June |
| July | 16°C / 11°C | First departures crowded from late July | Dam discharge all day; Mikurigaike season |
| August | 18°C / 12°C | Obon in mid-August especially busy | Dam discharge all day; Mikurigaike season |
| September | 15°C / 9°C | Leaf-season holiday weekends from mid-September | Leaves at Murodo-daira mid-September, Daikanbo late September |
| October | 10°C / 3°C | Leaf weekends and busy early departures to mid-October | Leaves at Midagahara early October, Kurobe Dam mid-October, Bijodaira late October; discharge ends 15 October |
| November | 2°C / -5°C | Winter schedule from 4 November | Leaves at Tateyama Station and Shomyo Falls early November; Yukitabi event 1–30 November; route closes 30 November |
alpen-route.com (operator); Tateyama Kurobe Alpine Route (alpen-route.com) (operator); h-tateyama.alpen-route.co.jp (resort)
Colder figures from a second table
A second Murodo temperature table runs lower than the official FAQ. It puts April’s average high at 3.7°C rather than 6°C, and November’s at 1.9°C7 rather than 2°C1. Pack for the colder set.
Cold, altitude and medical help
End of the season
Closures and the winter shutdown
The Alpine Route runs 15 April to 30 November 20262 and closes for winter from December3. Late November gets thin, so check the operator’s notices before you travel.
Highland Bus ended 27 November15
How this season wound down:
- The winter schedule took effect on 4 November16, with big changes to first and last departures.
- The first snowfall on the mountains came on the night of 27 October, normal for recent years but a little later than in the past ten years17.
- By 10 November17, Murodo-daira was white all over.
- Lodges keep their own dates: Mikurigaike Onsen’s season ended on 24 November 202618. Check each hotel near Murodo Station before you book.
Snow piles up fast over winter. Murodo had 390 cm of snow on 16 December 2024, against 60 cm3 at the same point a year earlier.
The operator first posted this season’s dates on 1 December 202519. Look on the official site for next season’s opening.
Questions people ask
Where can you check the weather forecast for the Tateyama Kurobe Alpine Route?
Check the operator's website and social media: it keeps posting snow information and mountain updates, even during the winter closure from December.
How do you get onto the Tateyama Kurobe Alpine Route?
Enter from Tateyama Station in Toyama or from Ogizawa in Nagano; private vehicles can't drive between the two. The train from Dentetsu Toyama to Tateyama Station takes 65 minutes.
Photos: Wikimedia Commons. Authors and licences: image credits
Checked against 22 sources · last checked November 2026
- alpen-route.com (operator) · checked November 2026
- Tateyama Kurobe Alpine Route (alpen-route.com) (operator) · checked November 2026
- zaikei.co.jp (news) · checked November 2026
- alpen-route.com (operator) · checked November 2026
- alpen-route.com (operator) · checked November 2026
- Tateyama Kurobe Alpine Route (alpen-route.com) (operator) · checked November 2026
- h-tateyama.alpen-route.co.jp (resort) · checked November 2026
- alpen-route.com (operator) · checked November 2026
- alpen-route.com (operator) · checked November 2026
- alpen-route.com (operator) · checked November 2026
- alpen-route.com (operator) · checked November 2026
- alpen-route.com (operator) · checked November 2026
- alpen-route.com (operator) · checked November 2026
- Yamakei Online (news) · checked November 2026
- Tateyama Kurobe Alpine Route (alpen-route.com) (operator) · checked November 2026
- Tateyama Kurobe Alpine Route (alpen-route.com) (operator) · checked November 2026
- alpen-route.com (operator) · checked November 2026
- Mikurigaike Onsen (resort) · checked November 2026
- alpen-route.com (operator) · checked November 2026
- alpen-route.com (operator) · checked November 2026
- Tateyama Kurobe Alpine Route (alpen-route.com) (operator) · checked November 2026
- Tateyama Kurobe Alpine Route (alpen-route.com) (operator) · checked November 2026
Page history · last changed 28 November 2026
- First written